Ergo is proud to have supported Top Energy with the recently commissioned extension of their Ngāwhā Transmission Substation, a site we originally designed in 2019. The extension enables an (N-1) security connection for the Ngāwhā Geothermal Power Station onto Top Energy’s 110kV network – providing a higher capacity and more secure connection for the baseload power station to connect to the network and ultimately provide reliable, renewable energy to the Northland region.
The project scope included:
Ergo’s services included:
Special thanks to Omexom and their sub-contractor Connels for the construction of the extension.